{"id":417,"date":"2018-05-22T22:10:29","date_gmt":"2018-05-22T20:10:29","guid":{"rendered":"http:\/\/www.hering.ba\/2018\/05\/22\/potpisan-ugovor-o-izgradnji-dionice-autoputa-na-koridoru-vc-dionica-mostar-jug-pocitelj-poddionica-buna-pocitelj\/"},"modified":"2019-03-29T13:13:25","modified_gmt":"2019-03-29T12:13:25","slug":"potpisan-ugovor-o-izgradnji-dionice-autoputa-na-koridoru-vc-dionica-mostar-jug-pocitelj-poddionica-buna-pocitelj","status":"publish","type":"post","link":"http:\/\/www.hering.ba\/en\/potpisan-ugovor-o-izgradnji-dionice-autoputa-na-koridoru-vc-dionica-mostar-jug-pocitelj-poddionica-buna-pocitelj\/","title":{"rendered":"Signed Contract for Construction of Motorway Section on Corridor Vc, section Mostar south-Po\u010ditelj, subsection Buna-Po\u010ditelj"},"content":{"rendered":"\n<p>The Contract for the construction of section of motorway Mostar South &#8211;  Po\u010ditelj, Subsection Buna &#8211; Po\u010ditelj, was signed on 18.05.2018. in  Mostar and the value of the works is 25.692.383,53 Euro.<br>The Contract  was signed by the Director of JP Autoceste FBiH Adnan Terzi\u0107, Director  of Hering d.d. \u0160iroki Brijeg Ladislav Bevanda and Federal Minister of  Transport and Communications Denis Lasi\u0107.<br>The deadline for construction of this section is 18 months.<br>Supervision over construction will be carried out by Aecom, USA.<br>The money is secured through the European Bank for Reconstruction and Development (EBRD) loan. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Description of section<\/h2>\n\n\n\n<p>The length of the sub-section Buna &#8211; Po\u010ditelj is 7.2 kilometers. It  starts at about 4 km south of the village of Hodbina. The track does not  cross the inhabited area, but passes over the Neretva canyon near  several inhabited places and ends just in front of the loop of Po\u010ditelj.  The route includes two overpasses, one underpass and two crossings for  animals, as well as the construction of a two-sided rest area &#8220;Rotinski  potok&#8221;.<br>Proper environmental management will focus on the collection  and treatment of sanitary waste water, pre-treatment of rainwater from  the parking lot, maintenance of oil separators and municipal waste  management.<br>\u00a0<br>The route does not cross any protected nature or  cultural- historical heritage, while the humid habitat of Hutovo Blato  (Ramsar area and IBA area) is about 8 km south. <\/p>\n\n\n\n<ul class=\"wp-block-gallery columns-4 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><a href=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/Potpis-ugovora-autoceste-buna-pocitelj.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"447\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/Potpis-ugovora-autoceste-buna-pocitelj.jpg\" alt=\"Potpisan Ugovor o Izgradnji Dionice Autoputa na Koridoru Vc, dionica Mostar jug-Po\u010ditelj, poddionica\" data-id=\"42\" data-link=\"http:\/\/www.hering.ba\/potpis-ugovora-autoceste-buna-pocitelj\/\" class=\"wp-image-42\"\/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/potpis-hering-vlada-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"510\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/potpis-hering-vlada-2.jpg\" alt=\"Potpisan Ugovor o Izgradnji Dionice Autoputa na Koridoru Vc, dionica Mostar jug-Po\u010ditelj, poddionica\" data-id=\"41\" data-link=\"http:\/\/www.hering.ba\/potpis-hering-vlada-2\/\" class=\"wp-image-41\" srcset=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/potpis-hering-vlada-2.jpg 768w, http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/potpis-hering-vlada-2-300x200.jpg 300w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0011.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"450\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0011.jpg\" alt=\"Potpisan Ugovor o Izgradnji Dionice Autoputa na Koridoru Vc, dionica Mostar jug-Po\u010ditelj, poddionica\" data-id=\"40\" data-link=\"http:\/\/www.hering.ba\/dji_0011\/\" class=\"wp-image-40\" srcset=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0011.jpg 800w, http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0011-768x432.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0010.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0010.jpg\" alt=\"Potpisan Ugovor o Izgradnji Dionice Autoputa na Koridoru Vc, dionica Mostar jug-Po\u010ditelj, poddionica\" data-id=\"39\" data-link=\"http:\/\/www.hering.ba\/dji_0010\/\" class=\"wp-image-39\" srcset=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0010.jpg 1024w, http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/DJI_0010-768x432.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Contract for the construction of section of motorway Mostar South &#8211; Po\u010ditelj, Subsection Buna &#8211; Po\u010ditelj, was signed on<\/p>\n<p><a class=\"read-more\" href=\"http:\/\/www.hering.ba\/en\/potpisan-ugovor-o-izgradnji-dionice-autoputa-na-koridoru-vc-dionica-mostar-jug-pocitelj-poddionica-buna-pocitelj\/\">More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":418,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6],"tags":[],"class_list":["post-417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/comments?post=417"}],"version-history":[{"count":4,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/417\/revisions"}],"predecessor-version":[{"id":422,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/417\/revisions\/422"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/media\/418"}],"wp:attachment":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/media?parent=417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/categories?post=417"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/tags?post=417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}