{"id":423,"date":"2018-09-06T14:40:16","date_gmt":"2018-09-06T12:40:16","guid":{"rendered":"http:\/\/www.hering.ba\/2018\/09\/06\/potpisani-ugovori-u-okviru-modernizacije-cestovnog-sektora\/"},"modified":"2019-03-29T13:16:37","modified_gmt":"2019-03-29T12:16:37","slug":"potpisani-ugovori-u-okviru-modernizacije-cestovnog-sektora","status":"publish","type":"post","link":"http:\/\/www.hering.ba\/en\/potpisani-ugovori-u-okviru-modernizacije-cestovnog-sektora\/","title":{"rendered":"Signed contracts under the Road sector modernization project"},"content":{"rendered":"\n<p>Under the Federation Road Sector Modernization Project, Contracts for  works for Three Lots have been signed in the premises of the PC Roads of  the Federation of BiH d.o.o. Sarajevo.<\/p>\n\n\n\n<p>The subject Works are devided into three Lots namely:<\/p>\n\n\n\n<p>Lot 1: Improvements to Tunnel Vranduk II and Reconstruction of the Bridges Bosna IV &amp; V. The Contractor is JV HERING d.d. \u0160iroki Brijeg and BBM d.o.o. Sarajevo. Contract amount is BAM 16.769.997,23.<\/p>\n\n\n\n<p>Lot 2: Road  pavement Vitalj \u2013 Vlasenica (granica entiteta) and Reconstruction of  the Black Spot \u201cOlovo \u2013 nula\u201d. The Contractor is JV JATA GROUP d.o.o.  Srebrenik and ROADING d.o.o. Gra\u010danica. Contract amount is BAM  2.472.337,57.<\/p>\n\n\n\n<p>Lot 3: Improvements to Tunnel Ormanica (Pelagi\u0107evo-Srebrenik) and Reconstruction of the Black Spot \u201cHusino\u201d. The Contractor is JV JATA GROUP d.o.o. Srebrenik and HERING d.d. \u0160iroki Brijeg. Contract amount is BAM 3.221.460,41.<\/p>\n\n\n\n<p>Contracts\n were signed by Ljubo Pravdi\u0107, director of the PC Roads of the FBiH \nd.o.o. and authorized representatives of the successful Bidders per Lot.<\/p>\n\n\n\n<p>The\n subject Works will be founded from the World Bank (WB) and the European\n Investment Bank (EIB) funds. The planned commencement of the Works is \nSeptember 2018, while the total value of the Works is BAM 22.463.795,21.\n\n<\/p>\n\n\n\n<ul class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><a href=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/modernizacije-cestovnog-sektora.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"384\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/modernizacije-cestovnog-sektora.jpg\" alt=\"Potpisani ugovori u okviru Modernizacije cestovnog sektora\" data-id=\"48\" data-link=\"http:\/\/www.hering.ba\/?attachment_id=48\" class=\"wp-image-48\"\/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/modernizacije-cestovnog-sektora2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"384\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/03\/modernizacije-cestovnog-sektora2.jpg\" alt=\"Potpisani ugovori u okviru Modernizacije cestovnog sektora\" data-id=\"49\" data-link=\"http:\/\/www.hering.ba\/?attachment_id=49\" class=\"wp-image-49\"\/><\/a><\/figure><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Under the Federation Road Sector Modernization Project, Contracts for works for Three Lots have been signed in the premises of<\/p>\n<p><a class=\"read-more\" href=\"http:\/\/www.hering.ba\/en\/potpisani-ugovori-u-okviru-modernizacije-cestovnog-sektora\/\">More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":424,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6],"tags":[],"class_list":["post-423","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/comments?post=423"}],"version-history":[{"count":1,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/423\/revisions"}],"predecessor-version":[{"id":425,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/423\/revisions\/425"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/media\/424"}],"wp:attachment":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/media?parent=423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/categories?post=423"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/tags?post=423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}