{"id":804,"date":"2019-09-13T11:04:33","date_gmt":"2019-09-13T09:04:33","guid":{"rendered":"http:\/\/www.hering.ba\/potpisan-ugovor-za-radove-na-izgradnji-sistema-navodnjavanja-podrucja-visicka-kaseta-capljina\/"},"modified":"2019-10-30T15:31:12","modified_gmt":"2019-10-30T14:31:12","slug":"potpisan-ugovor-za-radove-na-izgradnji-sistema-navodnjavanja-podrucja-visicka-kaseta-capljina","status":"publish","type":"post","link":"http:\/\/www.hering.ba\/en\/potpisan-ugovor-za-radove-na-izgradnji-sistema-navodnjavanja-podrucja-visicka-kaseta-capljina\/","title":{"rendered":"Contract for works on construction of the irrigation system of the area&#8221;Vi\u0161i\u0107ka kaseta&#8221;, \u010capljina was signed"},"content":{"rendered":"\n<p> In the premises of City of \u010capljina was signed a contract relating to irrigation within the project &#8221; Vi\u0161i\u0107ka kaseta &#8221;. The contract is worth BAM 4.145.499,79 and was signed by the Federal Ministry of Agriculture, Water Management and Forestry on behalf of the end user of the City of \u010capljina as Employer and joint venture Hering dd Siroki Brijeg and Eccon Engineering doo \u010capljina as Contractor.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"413\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/10\/Visicka-kaseta-1-e1572433194770.jpg\" alt=\"\" class=\"wp-image-772\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"413\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/10\/Visicka-kaseta-2-e1572433168758.jpg\" alt=\"\" class=\"wp-image-774\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"http:\/\/www.hering.ba\/wp-content\/uploads\/2019\/10\/Vi\u0161i\u0107ka-kaseta-10.jpg\" alt=\"\" class=\"wp-image-776\"\/><\/figure>\n\n\n","protected":false},"excerpt":{"rendered":"<p>In the premises of City of \u010capljina was signed a contract relating to irrigation within the project &#8221; Vi\u0161i\u0107ka kaseta<\/p>\n<p><a class=\"read-more\" href=\"http:\/\/www.hering.ba\/en\/potpisan-ugovor-za-radove-na-izgradnji-sistema-navodnjavanja-podrucja-visicka-kaseta-capljina\/\">More&#8230;<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6],"tags":[],"class_list":["post-804","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/comments?post=804"}],"version-history":[{"count":1,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/804\/revisions"}],"predecessor-version":[{"id":806,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/posts\/804\/revisions\/806"}],"wp:attachment":[{"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/media?parent=804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/categories?post=804"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.hering.ba\/en\/wp-json\/wp\/v2\/tags?post=804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}