Construction of the main road M-17.3 Neum – Stolac, asphalting on the subsection Hutovo – Cerovica


Home  /  References

Rovinj-Performance of construction works at the RETAIL PARK CROATIA


Home  /  References

Rehabilitation of tunnel Čaklovići, section Simin Han1 -Donje Caparde, km 2+775


Home  /  References

Tunnel Vranduk hole-through


By digging the last meters of the rock, today the right side of the Vranduk tunnel on the Vranduk – Ponirak subsection was breached. The length of the right pipe of the Vranduk tunnel is 312 meters, and the contractor is the consortium Azvirt L.L.C (Azerbaijan) and HERING d.d. Široki Brijeg (BiH).

Work on breaking the tunnel began in late March this year and was performed in three shifts. At the entrance to the right tunnel tube, the geology was more complex, while as the excavation progressed it improved. Most of the works were performed in category III using microreinforced concrete. At the same time, works were carried out on the preparation of fine leveling shotcrete, the foundation of the secondary lining, and in worse categories, the footing.

In the left tunnel pipe there are 108 meters left to dig out of the total length of 456 meters. This two-pipe tunnel was built according to the new Austrian tunnel method (NATM). Supervision over the execution of works is performed by the consortium DRI investment management d.o.o. (Slovenia) – DIVEL d.o.o. Sarajevo (BiH). Funds for the construction were provided through the OPEC Fund for International Development (OFID). The Vranduk – Ponirak subsection is part of the Poprikuša – Zenica north (Donja Gračanica) section, which continues to the Nemila – Vranduk subsection in the north and to the Ponirak – Vraca subsection in the south. The total length of the subsection according to the project is 5.3 kilometers. The facilities on the route include the Vranduk 1 and Vranduk 2 bridges, which are constructed using cantilever construction technology, and the Vranduk tunnel, as well as three smaller viaducts. The specificity of the route is the layout of the left and right sidewalks of the motorway due to the fact that the motorway stretches through very steep slopes. The motorway is mostly located in a notch, which is why a significant number of high retaining walls have been designed, which will be operated with reinforced earth technology.

Home  /  References

Svilaj Bridge opened to traffic


During the ceremony at the Bosnian-Herzegovinian border crossing Svilaj on Thursday, September 30, 2021 the bridge SVILAJ over the Sava River was opened to traffic. Bridge is an integral part of the international pan-European road corridor 5C – Budapest-Beli Manastir-Osijek-Sarajevo-Ploče, and for the construction of which Hering dd Široki Brijeg was in charge.

The President of the European Commission Ursula von der Leyen, the Prime Minister of the Republic of Croatia Andrej Plenković and the Chairman of the Council of Ministers of BiH Zoran Tegeltija cut the ribbon together and thus marked the opening of the bridge to traffic..

The Svilaj Bridge over the Sava River is the contact point of the road network of the Republic of Croatia and Bosnia and Herzegovina. The length of the bridge is 660 meters, and the total width is 29 meters. Three lanes have been built for each direction. It is a project worth 53.8 million BAM.

Home  /  References

Construction of the highway Vc corridor, Drivuša-Kakanj section, Bilješevo Kakanj subsection


Home  /  References

Construction of the highway in Macedonia, stock of Kičevo Ohrid \ MK


Home  /  References

Construction of highway on the corridor Vc of Donja Gračanica-Drivuša section, Drivuša Klopče subsection MSS scaffolding


Home  /  References

Construction of highway on Corridor Vc, section Vlakovo Lepenica


Home  /  References

Reconstruction of the Spanish Square in Mostar